Bus update July Log Out | Topics | Search
Moderators | Edit Profile

BNO BBS - BNO's Bulletin Board System » THE ARCHIVES » Year 2011 » July 2011 » Bus update July « Previous Next »

Author Message
Bob Glines (Robertglines1)
Registered Member
Username: Robertglines1

Post Number: 38
Registered: 11-2010
Posted From: 75.205.10.66

Rating: N/A
Votes: 0 (Vote!)

Posted on Wednesday, July 06, 2011 - 4:39 pm:   

For those following the salvage rebuild of the 98 45 XlE .To date the 3 slides are in. we are finishing the rear bath. Judy has the shower stall tile installed and has done a nice mosiac. she is working on the sink counter top now. with tile and glass pattern. It will feature Maple cabinets in the rear bath and master bedroom area which has two slides. this area is in the final finishing stage. with all utilities and ac/heat installed. Foward of that. thru a sliding door is a half bath-buthut-on the opposithe wall a stack washer/dryer. going on foward is a kitchen area done in black cherry. The cabinets are in. The counter tops are Black Quartz.All utilities are in . .Ac and Heat are in the front area also. floor and ceilings need finishing. A 162 inch slide in living area with the refrig going out with it. the rest of the slide is a couch. What we need now is flooring and finishing electrical outlets. ceiling threatment/lighting.Gen set is bolted in place,but not wired in system yet. much mechanical to be finished. target date buy run to sun Jan 2012.fingersXXXXXX. probably will be in primer for this trip! Bob & Judy Evansville Indiana
joe padberg (Joemc7ab)
Registered Member
Username: Joemc7ab

Post Number: 526
Registered: 6-2004
Posted From: 66.38.159.33

Rating: N/A
Votes: 0 (Vote!)

Posted on Wednesday, July 06, 2011 - 4:50 pm:   

Bob

I am not sure if you ever detailed from what point you started, or the nature of the damage, would like to know. Sounds like you are making verygood progress.
John & Barb Tesser (Bigrigger)
Registered Member
Username: Bigrigger

Post Number: 536
Registered: 9-2007
Posted From: 96.42.5.35


Rating: N/A
Votes: 0 (Vote!)

Posted on Wednesday, July 06, 2011 - 10:34 pm:   

Geez, i thought I was really doing something to take the old refrigerator out! Good job though, that has to be a labor of love.
Bob Glines (Robertglines1)
Registered Member
Username: Robertglines1

Post Number: 39
Registered: 11-2010
Posted From: 75.205.198.45

Rating: N/A
Votes: 0 (Vote!)

Posted on Wednesday, July 06, 2011 - 11:23 pm:   

Bought Salvage shell rear brake fire for 1200$ no drive train. all air bags in rear gone. have replaced all mechanical in rear brakes suspension rebuild etc. Have 60 serries and eaton 10 spd autoshift for drive train and 4:56 rear gears. Fire did only minor interior damage. That has all been torn out and cleaned repaired. Body damage is being repaired. Total cost of build will be in the $20,000 completed relm as total looks now; this is not your high end prevost but what I can afford.Very Labor intensive! It is a hobby I love. as I could not afford to own a coach any other way. This is our 4th build.Thanks to this and the other board for a education and answers to questions it makes this project a possibility.
Mike Eades (Mike4905)
Registered Member
Username: Mike4905

Post Number: 212
Registered: 12-2000
Posted From: 70.126.183.226

Rating: N/A
Votes: 0 (Vote!)

Posted on Thursday, July 07, 2011 - 5:08 pm:   

I have run the 10 speed and had the tranny reprogramed for a 12 speed. It was less jerky on take off. I default to 3 rd gear. Just a thouoght.

Add Your Message Here
Posting is currently disabled in this topic. Contact your discussion moderator for more information.

Topics | Last Day | Last Week | Tree View | Search | Help/Instructions | Program Credits Administration